Why “minor works” abroad often aren’t minor

Many overseas buyers and owners describe their plans in reassuring terms.

“Just a light renovation.”
“Nothing structural.”
“Only internal changes.”
“A bit of reconfiguration.”

​

In their home country, those descriptions often do correspond to minor works.

Abroad, they frequently don’t.

Where the assumption comes from

Most people carry an internal rulebook shaped by experience at home:

  • what usually needs permission

  • what can be done quietly

  • what professionals will flag automatically

  • what can safely be decided later

 

That mental model feels reliable — until it’s applied in a different system.

 

The problem isn’t optimism.
It’s transferring assumptions across borders.

In many overseas projects, buyers also assume that someone else in the process will challenge those assumptions early — when in reality no one is specifically tasked with protecting the client’s overall position. That structural gap is explored further in Who actually protects the client when building abroad?

How “minor” is defined differently

In many countries, works are not categorised by how disruptive they feel to the client, but by how they affect the building in principle.

​

Seemingly modest changes can trigger wider obligations, such as:

  • planning or licensing requirements

  • technical upgrades linked to energy, structure or accessibility

  • formal design documentation where none was expected

  • additional professional appointments

 

What feels like a small scope can quietly cross a regulatory threshold.

And those thresholds are rarely intuitive.

Why this catches overseas clients out

Two things tend to happen at once:

  1. The project is framed as minor too early
    Decisions are made, costs discussed, and expectations set on that basis.

  2. Complexity only becomes visible later
    Often after purchase, or once design work is underway.

 

By the time the reclassification happens, time and money are already committed.

​No one has necessarily done anything wrong.

​

The issue is that the wrong level of scrutiny was applied at the start.

Many buyers assume this scrutiny is built into the system, when in reality it depends entirely on how professionals are appointed and where their responsibilities end. Understanding what independent advice actually means (and what it doesn’t) is key to avoiding that early misstep.

Does this vary by country?

Yes — significantly.

​

Planning thresholds, technical triggers, professional responsibilities and terminology differ from country to country.

But the pattern is consistent.

 

Across many systems:

  • the client is expected to define scope correctly

  • professionals respond to what they are asked to deliver

  • escalation happens procedurally, not proactively

 

The system doesn’t pause to ask whether the client meant to take on that level of obligation.

Where risk typically appears

Problems tend to surface:

  • when works are costed more formally

  • when permits or licences are discussed

  • when contractors flag requirements late

  • when timelines suddenly extend

 

At that point, the project hasn’t failed — but options have narrowed.

What could have been a decision becomes a consequence.

What clarity looks like early on

Early clarity isn’t about stopping projects.
It’s about understanding what a description like “minor works” actually implies in that context.

​

That means:

  • testing assumptions before they harden

  • understanding thresholds before crossing them

  • knowing which decisions are reversible — and which aren’t

 

That clarity has to be created deliberately.
It doesn’t come from optimism or informal reassurance.

Where Habitar fits

Habitar helps overseas buyers and owners understand whether their plans are genuinely straightforward — or quietly complex — before decisions become difficult to reverse.

 

Sometimes that confirms a light-touch approach is appropriate.
Sometimes it reveals obligations that are better understood early.

Both outcomes reduce risk.